India's favourite pump in the 36m class, the Schwing S36X is now
available in 3 pumpkit options.
Mountable on all 3 axil chassis of all leading truck manufacturers,
the pumps prime mover is the truck's engine itself. This PTO system
reduces operating costs and enables easy maintenance. The
unique design of the Schwing super X out rigger offers more space
for storage of accessories. While allowing the pump super
structure to be placed directly on the truck chassis.
This reduces
the weight of the pump and helps save fuel.
Optional features such as the one-sided stabilizing system "EASY",
the concrete stop valve at the end hose or the automatic lighting
system perfectly top off the practical suitability of this machine.
Special Features
The Vector Control.Using this
unique system operators can
communicate with this
machines, check operation
data and collect machine state
data in real time.
The radio remote control with
its intuitive keys and warning
systems helps operators to
quickly learn to operate the
pump.
The rock valve combines
with the open hydraulic
circuit reduces operating
cos t s whi l e enabl ing
concrete pumping of higher
pressures.
The repeated filtering and
cooling due to the open
hydraulic circuit reduces
h e a t g e n e r a t i o n a n d
component wear saving
money in the long run.
S 36 X, 4 - section roll and fold
system, height 36 m,
all purpose application.
X -H stabilising system,
supporting width
only 6.21m
S 36 X - Technical Data
Concrete Pump
Placing Boom
Type
P 1800
Placing boom
S 36 X
Max.pumping output
163 / 96* m3/h
Pumping line diameter
DN 125
Max. number of strokes
32 / 19* min
Length of end hose
4 m
Max. Concrete pressure
85** bar
Reaching height
35.2 m
Horiz, reach from Center of slewing axis
31.25 m
Type
P 2023
Number of ar ticulations
4
Max.pumping output
163 / 96* m3/h
Height of ar ticulations
4.1/12.05/19.65/27.25 m
Max. number of strokes
32 / 19* min
Lifting angle
96
Max. Concrete pressure
85** bar
1st folding angle
180
* depends on the engine power of the vehicle
** max. 85 bars through boom line
Max. pumping output and max. pumping pressure cannot be achievedat the same time.